Master Planning   /  Beatrice Hospital Master Plan

Altus began by holding a week long design charrette with each of the user-group stakeholders in the project. A programmatic wish list was developed and refined into a final functional program that had complete buy-in from the hospital management and staff. During this time, concept site and building plans were developed and refined. These concept plans became the basis for the facility that was ultimately constructed.

Sustainability:
The mechanical and electrical systems were designed to comply with ENERGY STAR® criteria. The design team also applied features of the Green Guide for Healthcare, which is a voluntary, self-certifying system modeled with permission after the LEED® rating system.

Client:
Beatrice Community Hospital & Health Center

Location:

Beatrice, Nebraska

Team:
Loren Lamprecht
Michael Hamilton
Jessica Doolittle

Awards:

2013 IIDA Silver Award, Great Plains Chapter

SF: 144,000
Date Complete: February 2012

Services:
Healthcare Planning
Master Planning
Space Evaluation & Programming
Design of a New Medical Facility
QA Inspections
Project Scheduling
Joint Commission Compliance
Construction Phase Services
Fire Protection/Life Safety Review
Cost Estimating Services